Planning Settings

Configure roles, rates, pipeline integration, and utilization targets.

Access Planning Settings at Planning > Settings or via Settings > Modules > Planning > Configure. These settings control how capacity is calculated, how the schedule board is displayed, and how Planning connects to CRM and Finance.

Rates in Planning are for internal planning and profitability purposes only. Finance invoices use the rates configured in Finance > Products — these are two separate rate tables.

Roles

Define the billable roles used in Planning (e.g., "Senior Developer", "UX Designer", "Project Manager"). Roles are used for:

  • Placeholder allocations — Allocate a role before the hire is confirmed
  • Rate calculations — Attach a default hourly rate to each role for profitability
  • Filtering — Filter the schedule board by role to find capacity

Each role has:

FieldDescription
Role nameDisplay name (shown on allocation bars and reports)
Default hourly rateUsed for profitability calculations unless overridden
BillableWhether this role's hours count as billable in reports

Hourly Rates

Set rates at two levels:

  • Blended rate — A single workspace-wide rate applied to all roles without a specific rate
  • Role-specific rate — Overrides the blended rate for that role

Rates can also be overridden per allocation — useful when a person's rate on a specific client project differs from their standard rate.

Utilization Targets

Set the target utilization percentage used to color-code the schedule board:

SettingDefaultEffect
Target utilization %80%Amber threshold; green below, amber at or above
Over-allocation threshold100%Red threshold; triggers over-allocation flag

These can be set workspace-wide or per role. For example, you might set a lower target for senior staff who need buffer time for mentoring and non-project work.

Pipeline Integration

Configure how CRM deals flow into Planning as resource requests:

  • Trigger stage — The CRM pipeline stage that creates a draft resource request (e.g., "Closed Won" or "Proposal Sent")
  • Default hours estimate — A fallback hour budget for new resource requests when the deal has no estimate attached
  • Auto-approve — Whether resource requests from the pipeline are automatically approved or require manual review

→ Capacity Planning Documentation — see "Demand from the CRM Pipeline"

Default Working Pattern

The fallback working pattern used for capacity calculations when an employee in People does not have a custom pattern set:

SettingDefault
Hours per day8
Days per week5

Changes here take effect immediately and recalculate capacity for all employees using the default pattern.

Capacity Display

SettingOptions
Display capacity inHours or days
Show weekends on boardOn / Off (default Off)
Week start dayMonday (default) or Sunday

Showing capacity in days can be more intuitive for teams that think in person-days rather than hours. Both modes use the working hours per day setting to convert.